Airtightness Testing of Raised Access Plenum Floors (BTS 4/2024)
A raised access plenum floor is a void between a building’s floor structure and the occupied space. This BSRIA Test Standard provides a methodology for testing raised access plenum floors and states limiting criteria for leakage. It supersedes BG 65/2016 Floor Plenum Airtightness – Guidance and Testing Methodology.
In response to stakeholder feedback to enhance and simplify the guide, BG 65/2016 Floor Plenum Airtightness – Guidance and Testing Methodology was superseded in 2024 by a new BSRIA Test Standard.
A raised access plenum floor is a void between a building’s floor structure and the occupied space, used for distributing conditioned air to the spaces above, consisting of two elements; the underfloor void and raised access floor. It is important that conditioned air in a floor plenum flows into the occupied zone and does not leak into cavities, risers, stairwells, heating trenches or other adjacent zones. A properly sealed raised access plenum floor will allow the diffusers and grilles to fulfil their primary role of delivering air at the correct flow rate. The airtightness of raised access plenum floors can be a serious energy efficiency issue.
This BSRIA Test Standard provides a methodology for testing raised access plenum floors. Limiting criteria for leakage from the underfloor void and raised access floor are provided, tailored to the challenges of smaller floor areas. Guidance on achieving both is provided. The testing methodology has also been enhanced to offer a complete process, eliminating the need to consult additional standards.
Specifying BTS 4/2024 can support an effective air distribution solution that aligns with design intentions for operational performance.
Revision History:
- Withdrawn: BG 12/2010 Floor Void Airtightness – Air Leakage Specification
- Superseded: BG 65/2016 Floor Plenum Airtightness – Guidance and Testing Methodology
- Current: BTS 4/2024 Airtightness Testing of Raised Access Plenum Floors
This article appears on the BSRIA news / blog and bookshop site as 'Airtightness Testing of Raised Access Plenum Floors (BTS 4/2024)' dated 01 December, 2024.
--BSRIA
[edit] Related articles on designing Buildings
- Airbrick.
- BSRIA articles.
- Displacement ventilation.
- Dynamic thermal modelling of closed loop geothermal heat pump systems.
- Earth-to-air heat exchangers.
- Floating floor
- Floating floors in buildings..
- Geothermal energy.
- Geothermal pile foundations.
- Ground energy options
- Ground preconditioning of supply air.
- Ground source heat pumps.
- Plenum.
- Raised floor.
- Thermal comfort.
- Thermal labyrinths.
- Underfloor air conditioning at London Grade II listed landmark.
- Underfloor air distribution UFAD.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Bridging the gap between clients and contractors
Concerns remain around contractor quality, capability, and delivery.
Construction Management, 10 June.
Heat pumps beat boilers in new home tests.
Building Safety Act implementation in Wales
CIAT to host industry panel on 26 June.
New and updated CLC building safety guidance.
New UK National Buildings Database.
Building Safety Wiki Interviews
Chief executive of the British Woodworking Federation.
Planning condition discharge in England and Wales
A brief explanation from a building compliance expert, with further links.
Overheating guidance and tools for building designers
Guidance for dealing with element of building fabric control that have increasing importance.
Shading for housing, a design guide
From the Good Homes Alliance and British Blind and Shutter Association.
UK Standard Skills Classification (SSC)
A shared framework for describing skills needs.
Social media ban consultation comes to close
CIOB urges UK Government to consider social media’s role in careers guidance in ban debate.